Oral solution bottle washing machine manufacturer with air and water glass bottle washer



Oral solution bottle washing machine manufacturer with air and water glass bottle washer

https://www.chinesepacker.com

Any questions,feel free to contact me.
Email: sales@chinesepacker.com Skype:zhang.tracy6 Tel:0086-13262514660
Click here to subscribe us

https://www.youtube.com/channel/UCo4XjYB_mRONyQKah8jbjVw

This glass bottle wasing machine is mainly used for clean the inside and outside of various material round bottle with filling range of 10-1000ml by “two water and one gas” (water, ionized water, oil free compressed air) alternately washing.
It makes sure the bottles meets requirements of production process, and it has function of initial drying the bottles.
Introduction:
PLC control system, color touch screen display.
Unique and compact structure, reasonable cleaning process.
Bottle spotlessness after washing, less water consumption.
Machine body and product touching part are made by stainless steel, completely meets GMP requirements.
Machine technical parameter:
Model: automatic glass bottle washing machine
Applicable specification:10-1000ml
Washing speed:30-60 bottles/min
Air supply:15m³/h, 0.4-0.8Mpa
Power supply:220V/380V, 50/60Hz
Power:1.5 KW
Circulating water:0.5-1m³/h
Machine dimension:L1500 × W850 × H1300mm
Machine neet weight:500kg
About Packing:
To ensure our service quality, we will execute the following packaging standards in delivery:
1.All the products before delivery should be tested by assemble and debugging engineer, wiped up and cleaned, then wrapped by stretch film to protect it from moist. The precision part need to flexible package.
2.In addition, without standard tools, manual and other documents, and allow ex-factory confirmation sheet, the machine cannot leave factory All the products will be packed in wooden case. The exported products use plywood case to pack. The foot margin of equipment fixed tightly to make the machine can experience loading and uploading, the upward mark will be posted on the wooden case.
Pre-sales:
According to client specific labeling requirement, supply reasonable machine sketch map,quotation and similar video for client ref first.

During Sales:
1) Depends on client products and labeling position, made reasonable reform base on the standard machine.
2) Repeat 20 ongoing hours testing equipment operation stability .
3) Execute GMP certification for the equipment and materials used in the production process requirement and specification strictly.

After sale:
1. Range experienced senior engineer come to client company for installation .
2. Supply systematic operation training for client workers.
3. Guarantees all equipment (except human factors) within one year, lifetime maintenance sevices.
4. After client use the machine for several years, we can provide a detailed refurbishment program, the original equipment and replacement of hardware and software upgrades.
5. If quality problems arise, the supplier provide technical support and timely supply wearing parts.


Post time: Jun-13-2017