Stand Up Spout Pouch Filling and Capping Packing Machine
Any questions,feel free to contact me.
Email:sales@chinesepacker.com Skype:zhang.tracy6 Tel:0086-13262514660
https://www.chinesepacker.com
Chick here to subscribe us
https://www.youtube.com/channel/UCo4XjYB_mRONyQKah8jbjVw
1 Electrical Appliance Case
2 Filling Device
3 Plunger Case
4 Cleaning Device
5 Charging Basket
6 Cap-screwing Device
7 Turntable
8 Finished Product Exit
9 Structure
Description
A packaging machine specially designed for liquid auto filling and capping .
All new design. The new technology of this machine is designed by our factory, which get the technical patent.
A highly automated machine.The operation cycle, from filling,capping,to product outfeed are fully automatically performed.
It’s a necessity in mass production line !
Suitable Containers : Standing up – pouch with cap
Suitable Packing Materials : Nylon Pouch / Metalized Pouch / Alumium Pouch
Available Products : Drinking Jelly/ Juice / Drinking Water / Soybean milk / Drinking Chocolate / Oil / Washing Liquids /All
kinds of Liquids
Working Steps
1) Hanging pouch
manually
2) Filling
3) Cleaning spout
4) Load cap by track
5) Put the cap
6) Screw cap
7) Outfeed
.Examining 1: While the machine is examining the pouch’s position.whether good or not, if not, the corresponding filling head
won’twork.
Examining 2: While the machine is examining the cap whether steady or not, if not, it will start alarm and refuse to work.
Features:
All machine materials are made of SS#304, PLC control with Touch Screen, Double Chain with best Sproket ,
High Precision Speed Reducer, Pneumatic Control, Photoelectric Switch.
The electrics and pneumatics for this machine are used famous brands.
Easy to operate, high speed to improve production efficiency and lower the production cost, reduce the labor,
less Maintain, easy to clean, lower Noisy
Technical Datas :
1) Description: spout filling and capping machine
2) Packaging speed: 1500-2500bags per min(2heads)
3) Filling content: 100-500ML
4) Power: 3-phase 4-line socket(380V 50HZ)
5) Electric Machinery
Power: 1.5KW
6) Heat up power: 2KW
7) Air pressure: 0.5Mpa-0.7Mpa
8) Max air consumption: 0.8m3/min
9) Machine
dimension(L*W*H): 2000x1350x2000mm
10)G.W.: 1000KG
1.Installation and Debugging
Before delivery, we takes responsible for debugging of machine, in order to make sure the provided machine could be safely
and smoothly put into operation.
We also take responsibility to have debugging overseas, and Client abroad please sends invitation forward of time to engineer,
provides the engineer with round-trip tickets, accommodation, vehicle and $50 per day salary.
2. User Training
Before delivery, we will take responsibility to indoctrinate technical training to the users so that they could understand the
machine features and could operate the machine by themselves.
3. Warranty Period
The warranty period for machine is one year with a life long maintenance. If the user requires special quality guarantee, other stipulated warranty period may be made after mutual agreement.Mechanical models are standard, make special design according to customer requirements.
Post time: Feb-01-2018