Short Lead Time for ASTM A194 7 Heavy Hex Nuts Wholesale to Qatar

Short Lead Time for ASTM A194 7 Heavy Hex Nuts Wholesale to Qatar

Short Description:

ASTM A194/A194M 7 Heavy Hex Nuts API 6A Flange Valve Wellhead Heavy Hex Nuts Dimension Standard: ASME B18.2.2, ASME B18.2.4.6M, ISO 4033, Din934 H=D Inch Size: 1/4”-4” with various lengths Metric Size: M6-M100 with various lengths Other Available Grade: ASTM A194/A194M 2H, 2HM, 4, 4L, 7, 7L, 7M, 8, 8M, 16 and so on. Finish: Plain, Black Oxide, Zinc Plated, Zinc Nickel Plated, Cadmium Plated, PTFE etc. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality, Comp...


Product Detail

Product Tags

Our commission is to serve our buyers and purchasers with most effective good quality and aggressive portable digital goods for Threaded Rod Joint Restraint, A193 B7 Socket Head Cap Screws price, A193 B8 Stud Bolts price, Our firm is dedicated to giving shoppers with significant and steady high quality goods at aggressive price tag, generating every single customer satisfied with our products and services.
Short Lead Time for ASTM A194 7 Heavy Hex Nuts Wholesale to Qatar Detail:

ASTM A194/A194M 7 Heavy Hex Nuts

API 6A Flange Valve Wellhead Heavy Hex Nuts

Dimension Standard: ASME B18.2.2, ASME B18.2.4.6M, ISO 4033, Din934 H=D

Inch Size: 1/4”-4” with various lengths

Metric Size: M6-M100 with various lengths

Other Available Grade:

ASTM A194/A194M 2H, 2HM, 4, 4L, 7, 7L, 7M, 8, 8M, 16 and so on.

Finish: Plain, Black Oxide, Zinc Plated, Zinc Nickel Plated, Cadmium Plated, PTFE etc.

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet

Advantage: High Quality, Competitive Price, Timely Delivery,Technical Support, Supply Test Reports

Please feel free to contact us for more details.


Product detail pictures:

Short Lead Time for ASTM A194 7 Heavy Hex Nuts Wholesale to Qatar detail pictures


Our rewards are reduce selling prices,dynamic revenue team,specialized QC,sturdy factories,superior quality services for Short Lead Time for ASTM A194 7 Heavy Hex Nuts Wholesale to Qatar, The product will supply to all over the world, such as: Bhutan, St. Petersburg, Mombasa, Our products are widely recognized and trusted by users and can meet continuously changing of economic and social needs. We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!



  • This tutorial will show you how to assemble an Auntie Em sewing cabinet from Arrow, available on our site at: https://www.overstock.com/Crafts-Sewing/Arrow-Auntie-Em-White-Crafts-Sewing-Machine-Table-with-Storage-and-Organization-Cabinet/6518568/product.html?cache=no

    Step 1: Gather a Phillips screwdriver, an electric screwdriver, a hammer, a wrench, and an adjustable socket wrench.

    Step 2: Drill connecting bolts into the appropriate holes in each panel. Also drop a cam lock nut into the larger holes of each panel so the arrow on each cam is pointing to the unfinished edge of its panel.

    Step 3: Install the drawer-runners on panel H using the pre-drilled holes. Drive the screws through each runner into the panel until the head of each screw is flush with the runner. Install drawer-runners the same way on panel F.

    Step 4: To install the drawer-stops, put a metal peg into the lower hole above each drawer-runner, then screw a drawer-stop into the higher hole. Leave the stop loose so it can swing around.

    Step 5: Install wooden dowels into panels P and Q. Ensure you are putting them into the dowel holes instead of the cam holes. If the hole lines up with a cam, it is a cam hole. With your mallet, tap the dowel in as far as it will go.

    Step 6: Attach panel Q to panel K by screwing the long black screws all the way through panel Q into panel K. Attach the handle by lining it up with the holes on the outside of panel K and drilling the handle bolts through both panel Q and panel K into the holes in the handle.

    Step 7: Take panels O and P, and install them onto panel G by slipping the connecting bolts in panel G into the cams on panels O and P. Tighten cams with your screwdriver, locking the panel into place. Repeat with the Q and K piece on the other side of panel G.

    Step 8: Take panel F and install it to the other ends of panels O and P and the Q-K piece. Make sure the drawer-runners on panel F are facing up. Tighten cams.

    Step 9: Install panel M onto the outside of panel F with the cams facing inward. Tighten cams.

    Step 10: Install panel N onto panel F, running perpendicular to panel M. Tighten cams.

    Step 11: Install panel H on top of panels N and M so the drawer-runners face inward. Tighten cams.

    Step 12: To install the casters, flip the cabinet upside down. Slip a caster-clip over the unfinished edge of a panel. Then, hammer the caster insert into the pre-drilled hole. Lastly, using a small piece of wood wedged between the wheels of the caster, hammer it into the hole of the caster insert. Repeat with each caster, making sure the casters with locking tabs are installed at the front of the cabinet. Flip the cabinet right side up so the casters are touching the floor.

    Step 13: To install the leaf supports I and J, attach leaf support hinges onto both. Make sure the raised portion and the recess of each hinge is facing you when you install it. Attach one of the round magnets to the top corner of the same face of the support as the hinges. Then put the self-stick rubber tab on the top edge of the hinge. Attach these to the sides of the cabinet so they fold to the back.

    Step 14: Attach a round strike plate to each side of the cabinet using one of the small screws. The magnet of each leaf support should cling to a strike plate when the leaf support is closed.

    Step 15: Install the air-lift into the cabinet by placing it into the cabinet so the holes in the air-lift panel line up with the appropriate holes at the back of the cabinet. Insert four carriage bolts through these holes so they hold the lit in place. Tap each of these bolts into place with your hammer. Then, on the inside of the cabinet, put a washer and a wingnut onto each bolt. Tighten the wing nuts as tight as you can.

    Step 16: Place the top of the cabinet onto the cabinet, lining up the connecting bolts with the cam holes. Tighten cams.

    Step 17: Assemble drawers by installing clips into the back of a drawer, then slipping the sides into these clips, lining up the inside groove. Slide the drawer bottom into this groove. Clip on the front of the drawer. Attach the drawer knob to the outside of the drawer using its bolt. Repeat for each drawer.

    Step 18: Flip cabinet upside-down. Set panel U in the opening of the cabinet top with the pre-drilled holes facing up and the curved edge in the back. Attach the wings using hex-head bolts, nuts, and washers, making sure the wing is on the inside of the lift and the flange is facing outwards.

    Step 19: Attach the wings to the bottom of Panel U using pan-head screws drilled through the holes in the flanges and the pre-drilled holes in the panel.

    Step 20: Slip the drawers into the cabinet.

    Subscribe to Our Overstock Channel on YouTube:  youtube.com/user/Overstock
    Like Overstock on Facebook: facebook.com/overstock/
    Follow Overstock on Pinterest: pinterest.com/overstock/
    Follow Overstock on Twitter: twitter.com/Overstock
    Follow Overstock on Instagram:  instagram.com/overstock/

    Related Products