Professional Design Brass Copper Set Screw Cup Point Grub Screws for Mumbai Manufacturers
Short Description:
Brass Copper Set Screw Grub Screws Metric Size: M1.4 – M52, Inch Size: 0# – 2″ Hexagon Socket(Allen), Torx Star, Square, Slotted Drive Types Flat Point, Cup Point, Cone Point, Dog Point Other Drive and Point Type are also available acc. to customer requirement Various Surface Finishes Various Material Grades are available Please feel free to contact us for more details
Product Detail
Product Tags
Professional Design Brass Copper Set Screw Cup Point Grub Screws for Mumbai Manufacturers Detail:
Brass Copper Set Screw Grub Screws
Metric Size: M1.4 – M52, Inch Size: 0# – 2″
Hexagon Socket(Allen), Torx Star, Square, Slotted Drive Types
Flat Point, Cup Point, Cone Point, Dog Point
Other Drive and Point Type are also available acc. to customer requirement
Various Surface Finishes
Various Material Grades are available
Please feel free to contact us for more details
Product detail pictures:
We believe in: Innovation is our soul and spirit. Top quality is our life. Purchaser need is our God for Professional Design Brass Copper Set Screw Cup Point Grub Screws for Mumbai Manufacturers, The product will supply to all over the world, such as: Burundi, Naples, Malta, With the spirit of credit first, development through innovation, sincere cooperation and joint growth, our company is striving to create a brilliant future with you, so as to become a most valuable platform for exporting our products in China!
Departmental Procedures & Guidelines for Inspections, Certifications, Load Testing, Repairs & Painting of Fire Escapes
Inspections by Structural Engineers, Fire Escape Engineers or others acceptable to the Official:
In layman’s terms, the city official is looking for a registered structural engineer or others qualified and acceptable by the Fire/Code Official to do a Critical Examination in lieu of a Live Load Test (criteria submitted or discussed prior to inspection) and issues written verification and certification that all connections are free of internal rust or rot as well as all original hardware (square head bolts or rivet) are reinforced and or replaced in lieu of Live Load Test. All supports (thru-bolts or cemented) into the wall must be verified and certified in lieu of Live Load Test. A fire escape confidence test and tag must be submitted if fire escape passed. The report with photos identifying violations for repairs must include repair criteria submitted to the official for repair vendor to use as a guide during and with engineer oversight of permitted repairs. A Fire Escape Confidence Test and tags identifying certified condition are then submitted. Recommended cycle for live load testing is 20 yrs after total refurbishment or as required by official.
Repairs by Ornamental Ironworkers, Welding Companies or others acceptable to the Official:
In layman’s terms, the city official is looking for a qualified licensed repair vendor to do all work under repair permit (if required) with engineer oversight of repair criteria submitted for approval to the official in lieu of Live Load Test. All connections must be free of internal rust or rot, spot primed and sealed. All worn material repaired and or replaced. All supports into wall reinforced, repaired and certified in a Fire Escape Confidence Test. In lieu of Live Load Test, all square head bolts, rivets and or welded connections must be certified, reinforced and or replaced based on age or condition. All ladders and cantilevers must be balanced and drop 2-3 ft per second, hit the ground and stay down and must lead to a public way. All roof ladders must be secure. No full painting of any fire escape until all spot painted repairs are inspected and certified under engineer oversight and or city official permit sign-off. Full replacement is subject to permits and or possible code upgrade requirements.
Painting by EPA Licensed Renovators (if lead paint is present) or others acceptable to Official:
In layman’s terms, the city official is looking for a paint vendor (EPA Certified Renovator if required) to do all work as per EPA Guidelines due to the fact that all fire escapes older than 1978 are presumed to have lead (EPA) unless identified as no lead or low lead by a licensed lead inspector. Entire building will be notified with signage and all precautions shall be taken to collect paint chips at grade. No sandblasting or power assisted scraping without full fire escape encapsulation under EPA Guidelines. All major connection shall be sealed from water intrusion before during or after painting. All escapes should be spot painted every 3-5 yrs and fully painted every 5-10 yrs or as needed or ordered by a Fire/Code Official.