Online Exporter U bolt for luzern Manufacturers

Online Exporter U bolt for luzern Manufacturers

Short Description:

U-bolts are typically used for attaching pipe or steel round bar to a round or square shaped post. Another common application is to hang wrought iron pipe in mechanical installations. They can also be embedded in concrete as anchor bolts. Inch Thread Size: 1/4″-4″ with various lengths Metric Thread Size: M6-M100 with various lengths Material Grade: Carbon Steel, Alloy Steel, and Stainless Steel covers ASTM F1554, A307, A449, A354, A193, A320, F593, ISO 898-1 4.8, 6.8, 8.8, 10.9 Fi...


Product Detail

Product Tags

Fast and superior quotations, informed advisers to help you choose the correct merchandise that suits all your requirements, a short generation time, responsible quality control and different services for paying and shipping affairs for Double End Studs price, Threaded Rod New Zealand, Stainless Steel Set Screws price, We sincerely welcome you come to visit us. Hope we have good cooperation in the future.
Online Exporter U bolt for luzern Manufacturers Detail:

U-bolts are typically used for attaching pipe or steel round bar to a round or square shaped post. Another common application is to hang wrought iron pipe in mechanical installations. They can also be embedded in concrete as anchor bolts.

Inch Thread Size: 1/4″-4″ with various lengths

Metric Thread Size: M6-M100 with various lengths

Material Grade: Carbon Steel, Alloy Steel, and Stainless Steel covers ASTM F1554, A307, A449, A354, A193, A320, F593, ISO 898-1 4.8, 6.8, 8.8, 10.9

Finish: Plain, Black Oxide, Zinc Plated, Hot Dipped Galvanized, and so on.

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet. Or, comply with your requirement.

Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports

Please feel free to contact us for more details.

 


Product detail pictures:

Online Exporter U bolt for luzern Manufacturers detail pictures

Online Exporter U bolt for luzern Manufacturers detail pictures


So as to provide you with ease and enlarge our business, we even have inspectors in QC Crew and guarantee you our best company and solution for Online Exporter U bolt for luzern Manufacturers, The product will supply to all over the world, such as: Swiss, Ukraine, Puerto Rico, We've more than 10 years exported experience and our products and solutions have expored more than 30 countries around the word . We always hold the service tenet Client first,Quality first in our mind,and are strict with product quality. Welcome your visiting!



  • website:https://www.jhmindustry.com/
    Shanghai Jian & Mei Industry and Trade Co., Ltd. is the company which manufacture and export fasteners and metal hardware, founded in 2006, with import-export authority. Now, 80% products export to all over the world and 20% sell in domestic market.



    https://www.etrailer.com/tv-Goose-Neck-Install-2005-Cheve-Silverado.aspx

    Videos are provided as a guide only. Refer to manufacturer
    installation instructions and specs for complete information.

    Today we are going to install part number 9463-34 from Draw-Tite. We are going to install this on a 2005 Chevrolet Silverado. First we are going to do is get the truck ready to install the hitch. Go ahead and lower the spare tire and get that out of the way because you are going to need to lean over the differential and tighten down the bolts. Next what you want to do is go ahead and get the exhaust and loosen it up so you have a little more working room to install the kit. When lowering the exhaust what you want to do is pull down a little bit and spray some lubricant in there, let it work in a little bit, then you can go ahead and pry it off. Okay there is one more towards the front of the vehicle, we will undo that one too. Now you have more flexibility to work around it. Our next step is to loosen the bed on one side, it does not matter what side just pick the one you prefer to work on. And there are going to be four of these bolts right here going along through the frame.

    We will just go ahead and undo those. The reason for loosing the bed is we will have more working room when putting in our cross bars in the bed. The next thing we are going to do is make room for the hitch. The heat shield right here is in the way, its made out of aluminum so it is real easy to cut through. We are going to cut it right where this cross member is and then right in front of the shock tower right here in this small part coming out. That will give us plenty of room to install our hitch. All right next we need to get the fuel vapor pump out of the way, we just want to knock it around, it will go back up when we are done. You want to push that latch in and it slides right out. And then next you have to do is trim this heat shield here and just pull it down out of the way. All right next we are going to mark our bed to drill out our hole. We will want to start off by finding the center rib. Going from the edge of the bed itself, not the tailgate, and we mark out as specified in the instructions. All right next we will go ahead and take our tape measure and center it between the fender wells. It is a good idea to go ahead and put a good dimple in it so we can see it from the bottom of the corrugation, so when we put our rails in we can make sure they are centered properly. So since we loosened the bed before we can go ahead and pick it up and get it ready to install our rails. You can use a pry bar to lift it up and put in some wooden blocks.

    First we are going to do is prepare our rails, we are going to put our bolts in. This is our front rail by the way, you can tell by how it dips down here. We will go ahead and install our bolts, just them into place and put a nut in the back to hold them in place while we go ahead and slide them in. And the rail that goes to the back actually goes in the slots. Right we can go ahead and slide our rails in, start with the back one. We will just push that back towards the back rail, it does not have to be anywhere precise right now. Now we will do our front rail. Next we will install our plate. This channel goes in this hat channel right here, which allows it to line up with the existing hole in the frame here. And we will put our flat washers, lock washers, and nuts on it. We are not going to tighten them or anything like that now, we are just getting all the hardware installed. All right next we are going to install our u-bolt, put it around the frame and out through the holes of the plate, and we will install a conical tooth washer and nut. When we install the u-bolt on the drivers side you are going to find there is some wiring, a brake line, and some more wiring.

    Related Products