Hot-selling attractive price ASTM A193 B7 All Threaded Stud Bolts Supply to Florida
Short Description:
ASTM A193/A193M B7 All Threaded Stud Bolts API 6A 6D Flange Valve Wellhead ASME/ANSI Flange All Thread Stud Bolts Alloy steel bolting for pressure vessels, valves, flanges, and fittings for high temperature or high pressure service, or other special purpose applications. Standard: IFI-136, ASME B16.5, DIN976 Inch Size: 1/4”-4” with various lengths Metric Size: M6-M100 with various lengths Other Available Grade: ASTM A193/A193M B7, B7M, B16, B8 Class 1 & 2, B8M Class 1 & 2, ASTM A320/...
Product Detail
Product Tags
Hot-selling attractive price ASTM A193 B7 All Threaded Stud Bolts Supply to Florida Detail:
ASTM A193/A193M B7 All Threaded Stud Bolts
API 6A 6D Flange Valve Wellhead ASME/ANSI Flange All Thread Stud Bolts
Alloy steel bolting for pressure vessels, valves, flanges, and fittings for high temperature or high pressure service, or other special purpose applications.
Standard: IFI-136, ASME B16.5, DIN976
Inch Size: 1/4”-4” with various lengths
Metric Size: M6-M100 with various lengths
Other Available Grade:
ASTM A193/A193M B7, B7M, B16, B8 Class 1 & 2, B8M Class 1 & 2,
ASTM A320/A320M L7, L7M, L43, B8 Class 1 & 2, B8M Class 1 & 2, and so on.
Finish: Plain, Black Oxide, Zinc Plated, Zinc Nickel Plated, Cadmium Plated, PTFE etc.
Packing: Bulk about 25 kgs each carton, 36 cartons each pallet
Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports
Please feel free to contact us for more details.
Product detail pictures:
We always continually provide you with the most conscientious customer service, and the widest variety of designs and styles with finest materials. These efforts include the availability of customized designs with speed and dispatch for Hot-selling attractive price ASTM A193 B7 All Threaded Stud Bolts Supply to Florida, The product will supply to all over the world, such as: Turin, Tajikistan, Nepal, By integrating manufacturing with foreign trade sectors, we can provide total customer solutions by guaranteeing the delivery of right products to the right place at the right time, which is supported by our abundant experiences, powerful production capability, consistent quality, diversified product portfolios and the control of the industry trend as well as our mature before and after sales services. We'd like to share our ideas with you and welcome your comments and questions.
This video shows the user how to hang a DVX display cabinet on a video scoreboard.
Video Transcript:
Welcome to DVX product Installation Overview Video: Hanging the Display Cabinet.
Prior to hanging the sections, an installer must perform a structural verification of the structure. To verify the stringer width, the installer will compare all measurements to the contract specific drawing. Measure the distance from one end of the lowest stringer to the other. Mark the center point on the structure for installation reference. Repeat the measurement for each stringer level. To verify stringer location, measure from the top of the lowest stringer top of steel to the top of steel for each stringer level above. Repeat these measurements at both ends of each stringer, at each vertical support, and at mid-span of any spans over 25 feet. If stringers are more than ½” away from designed location, contact the Project Manager.
To verify stringers are generally in line, also called ends are plumb, hang a plumb bob from the end of the top stringer such that the string doesn’t touch any stringers. Measure from the string to the end of each stringer. Repeat these measurements at both ends of the structure. If the ends of the stringer are more than plus or minus 1 inch from plumb, contact the Project Manager. To verify front faces of stringers are plumb to each other, hang a plumb bob from above the top stringer, so that the string doesn’t touch any stringers, and measure from the string to front face of each stringer. Repeat these steps at both ends and the middle of the stringer. If measurements vary by more than plus or minus ½ inch contact the Project Manager.
To verify the bottom stringer is straight. At both ends of the bottom stringer, measure back a set distance (X) from the front face of the stringer and stretch a line tight between those points. Measure from the front face of the stringer to the string line at approximately 10 foot intervals along the length of the stringer. Repeat measurement for additional bottom stringers. If measurements vary by more than plus or minus ½ inch contact the Project Manager.
Hanging the display to the steel frame is the next step in the process. A crane picks up the display using the lift points. Eye bolts are used for tag lines. As the crane is lifting the Next Section from the crate, it is essential the display cabinet does not hit anything and that the other displays are anchored so they don’t fall over. As the display is raised, a person or persons will tether the display cabinet so it does not get damaged. Before you hang the first display cabinet find the centerline of the steel structure. It is recommended that the first display cabinet hung is the bottom center. Make sure the clip angles are loose before flying the display cabinet.
After the first display cabinet is centered and level, ensure a plum measurement is taken before fastening securely. Then move in a left outward direction to hang the cabinets. Once completed, hang the cabinets in a right outward direction of the center cabinet on the bottom row. When the bottom row is hung proceed to the next level up by hanging the center display cabinet and move outward hanging cabinets in a left and right direction.
Here is a fastening sequence to help the Installer hang the cabinets correctly. Make sure the clip angles are loose before flying the display cabinet. The section must be plum and level. All other sections to be hung rely on this. Set the clip angles and tighten them to the display. Permanently attach the clip angles to the structure using the method called out for in the contract specific shop drawing.
The next display section will be hung to the left and right of the center display. Follow the configuration drawing sequence. Before flying the rest of the sections on the row loosen the top and bottom clip angles. Slide the top down and the bottom up. Use precision blocks in the corners of the cabinets to align the cabinets together. Temporarily secure the vertical portion of the section to the structure.
**Video Transcript continued in comments**