Hot sale reasonable price Metal Garden WindMill for British Factory
Short Description:
8 FT. WINDMILL ORNAMENT, RED&GREEN Durable steel body with weather-resistant, green and yellow finish Permanently lubricated ball bearings for whisper-quiet operation Unique design features a fan head that always faces the wind Charming, decorative old-world design blends beautifully with any landscape Assembled height: 8ft / 2.4M Assembly required Please read the assembly and safety information enclosed Please feel free to contact us for more details.
Product Detail
Product Tags
Hot sale reasonable price Metal Garden WindMill for British Factory Detail:
8 FT. WINDMILL ORNAMENT, RED&GREEN
Durable steel body with weather-resistant, green and yellow finish
Permanently lubricated ball bearings for whisper-quiet operation
Unique design features a fan head that always faces the wind
Charming, decorative old-world design blends beautifully with any landscape
Assembled height: 8ft / 2.4M
Assembly required
Please read the assembly and safety information enclosed
Please feel free to contact us for more details.
Product detail pictures:
We thinks what customers think, the urgency of urgency to act in the interests of a customer position of principle, allowing for better quality, lower processing costs, prices are more reasonable, won the new and old customers the support and affirmation for Hot sale reasonable price Metal Garden WindMill for British Factory, The product will supply to all over the world, such as: Rio de Janeiro, Algeria, Luxemburg, Due to the changing trends in this field, we involve ourselves into products trade with dedicated efforts and managerial excellence. We maintain timely delivery schedules, innovative designs, quality and transparency for our customers. Our moto is to deliver quality products within stipulated time.
Rachel Gingell will go thru the steps to repair a lift cover on a Ford 8N, the steps will also work on a Ford 9n, Ford 2N, Massey Ferguson TO20 or Massey Ferguson TO30.
Many of the bolts and pins were removed or loosened ahead to save time.
Parts used:
Hydraulic lift quadrant lever friction disc – https://www/steinertractor.com/FDS073
Hydraulic lift cover repair gasket kit – https://www/steinertractor.com/ABC089
Hydraulic lift cylinder – ABC299
Hydraulic lift lever control friction plate – https://www/steinertractor.com/FDS242
PTO gasket – https://www/steinertractor.com/ABC313
O-Ring only (for hydraulic lift piston – https://www/steinertractor.com/ABC315
Hydraulic pump safety valve assembly – https://www/steinertractor.com/FDS353
Hydraulic lift piston – https://www/steinertractor.com/ABC316
Ford & Ferguson hydraulic repair video – https://www/steinertractor.com/VID03D
Aspropyrgos SITE 1985/87,Part 5
Unfolding memories 30 years later.
Upgrading Project:Contract Nr:218-AF-14-007 Aspropyrgos Refinery
Video was taken during the upgrading of Aspropyrgos refinery in 1985 /1987, at Greece – BIOKAT ATBEE being the main Contractor for Mechanical Electrical and Instrumentation Works- of Units:
3300, 3900 3100,4000,4700,4100/4200 and 3600/4300 Lump Sum turnkey Project.
In this Part 5 there are shown the followings:
a) The final placement on its foundation of Vessel/Tower N4101, weight 249 Metric. ton, performed by Am. Hoist Derrick Crane/BIOKAT ATBE, utilizing a Boom=230ft(70,12mtr) , Mast =230ft(70,12mtr on the 23RD March 1986 , up to 12:53.20 minute.
The tower had been upraised above the installed anchor bolts which were if I remember well 36…It was a very difficult task to lower the tower so that all the installed anchor bolts to pass through the proper holes of the tower andat the same time the tower to have the proper orientation (previous part of N4101 erection
https://youtu.be/d0l1qxtOFTg )
b) As from 13:02.52 minute, the erection procedure of Vessel/Tower K4101, weight 129 Metric ton, performed by Am. Hoist Derrick Crane/BIOKAT ATBE, utilizing a Boom=280ft (85,23mtr), Mast =230ft(70,12mtr) which it was lifted on two parts:
This tower was to be up raised above the already installed steel structure and then lowered into this within this steel structure till to be secured on its foundation. Thus due to boom length/mast of AM Hoist restriction, I proposed the caudal section to be cut, thus making this lift possible with a minor change in the boom of the crane. Therefore, only for this lift, which it was the last one of the heavy lifts, a 50ft long section of boom was added to increase the total length of the boom as from 230 ft to 280ft.
Thus allow safe “boom to tower” clearance during erection at the out most lift position, when lifting object comes to the closest distance as from the boom. ( note the clearance at the last minute of this video)
In this video the upper section of the Tower K4101 it is erected all the (way) height above the steel structure and then lowered in to meet the caudal section, already being installed.
The last part of the erection is shown on Aspropyrgos SITE 1985/87, Part 6 “you tube video”
More details Aspropyrgos Site 1985/87 in here