High Quality for ASTM A194 2HM Heavy Hex Nuts for Holland Manufacturer

High Quality for ASTM A194 2HM Heavy Hex Nuts for Holland Manufacturer

Short Description:

ASTM A194/A194M 2HM Heavy Hex Nuts API 6A Flange Valve Wellhead Heavy Hex Nuts Dimension Standard: ASME B18.2.2, ASME B18.2.4.6M, ISO 4033, Din934 H=D Inch Size: 1/4”-4” with various lengths Metric Size: M6-M100 with various lengths Other Available Grade: ASTM A194/A194M 2H, 2HM, 4, 4L, 7, 7L, 7M, 8, 8M, 16 and so on. Finish: Plain, Black Oxide, Zinc Plated, Zinc Nickel Plated, Cadmium Plated, PTFE etc. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality, Co...


Product Detail

Product Tags

We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate inside our success for Steel Washers Sizes, Din976 Threaded Rods price, Steel Tower Bolts price, We welcome new and previous customers from all walks of lifestyle to contact us for long run organization relationships and mutual achievements.
High Quality for ASTM A194 2HM Heavy Hex Nuts for Holland Manufacturer Detail:

ASTM A194/A194M 2HM Heavy Hex Nuts

API 6A Flange Valve Wellhead Heavy Hex Nuts

Dimension Standard: ASME B18.2.2, ASME B18.2.4.6M, ISO 4033, Din934 H=D

Inch Size: 1/4”-4” with various lengths

Metric Size: M6-M100 with various lengths

Other Available Grade:

ASTM A194/A194M 2H, 2HM, 4, 4L, 7, 7L, 7M, 8, 8M, 16 and so on.

Finish: Plain, Black Oxide, Zinc Plated, Zinc Nickel Plated, Cadmium Plated, PTFE etc.

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet

Advantage: High Quality, Competitive Price, Timely Delivery,Technical Support, Supply Test Reports

Please feel free to contact us for more details.


Product detail pictures:

High Quality for ASTM A194 2HM Heavy Hex Nuts for Holland Manufacturer detail pictures


Control the standard by the details, show the power by quality. Our organization has strived to establish a highly efficient and stable employees team and explored an effective high-quality command method for High Quality for ASTM A194 2HM Heavy Hex Nuts for Holland Manufacturer, The product will supply to all over the world, such as: Florida, Japan, Detroit, We have been persisting in the business essence Quality First, Honoring Contracts and Standing by Reputations, providing customers with satisfying goods and service. Friends both at home and abroad are warmly welcome to establish everlasting business relations with us.



  • Websit: https://www.jmtornillo.com
    Ahora me gustaría presentarle las tuercas de seguridad.
    Los estándares son ASME/ANSI B18.2.2; DIN985, DIN982
    Los grados son SAE J995 Gr.2, 5,8 and class 4, 5, 6, 8, 10, 12.
    Este es la tuerca de seguridad zincada amarilla con nylon blanco de IFI y este es del estándar DIN con nylon azul.
    La tuerca es disponible con tipos de pernos en aplicación.
    Tambien podemos fabricar tuercas de seguridad especiales según sus muestras y dibujos
    Shanghai Jian y Mei es un proveedor profesional de tuercas de estándar IFI y DIN, por ejemplo tuerca hexagonal pesada, tuerca hexagonal, tuerca cuadrada, tuerca flange, tuerca de bloqueo y Tuercas hexagonales de Acoplamiento etc.
    Tenemos tamaños completos de M3 a M100, y 3/16” a 4”.
    Los materiales pueden ser acero al carbono, acero de aleación, acero inoxidable y cobre.
    Grados disponibles de tuercas son ASTM A563 grado A, grado C, grado DH, ASTM A194 Gr. 2, 2H, 7, 7M,8, 8M, SAE J995 Gr.2, 5,8; CL4, 5, 6, 8, 10, 12.
    Los acabados son Zinc, Zinc amarillo, Óxido negro, galvanizado etc.
    Tenemos más de ocho años de experiencia exportar Tuerca de seguridad al mercado américo y poseemos buena fama, enfíen en nosotros que somos su proveedor fiable de fijación!
    No dude en contactarnos en cualquier momento!
    Shanghai Jian & Mei Industry and Trade Co., Ltd
    Rm.27202, No.295 South Lingyan Road, Pudong,Shanghai,P.R.C, Code:200126
    Tel: 0086-21-33328690-8058
    Fax: 0086-21-68413263
    English Web:www.jm-industry.com Websit: https://www.jmtornillo.com
    Contact: Mrs.Xarella Huang
    Email: Jminfo@jm-industry.com
    Websit: https://www.jm-industry.com



    TIMING BELT REPLACEMENT – 2.2L 5SFE – Toyota Camry
    Toyota Camry Timing Belt Replacement
    Category:
    Autos & Vehicles
    Tags:
    Timing Belt Replacement
    Installation
    1.Install No. 2 idler pulley (if removed). Install and tighten bolt to specification. Ensure idler pulley is clean and rotates smoothly.

    2.Install No. 1 idler pulley and tension spring (if removed). Pry No. 1 idler pulley away from timing belt area as far as possible. Temporarily tighten No. 1 idler pulley bolt. Ensure idler pulley is clean and rotates smoothly.

    3.Using crankshaft pulley bolt, rotate crankshaft so timing mark on crankshaft sprocket aligns with timing mark on oil pump housing. See. This will position keyway in crankshaft sprocket at 12 o’clock position.

    CAUTION:If reusing timing belt, ensure reference marks on timing belt align with reference marks placed on crankshaft and camshaft sprockets. Ensure timing belt is installed in original direction of rotation.

    4.Ensure all sprockets and idler pulleys are clean. Install timing belt on crankshaft sprocket, oil pump sprocket, No. 1 idler pulley, and then No. 2 idler pulley in sequence.

    5.Install timing belt guide with cupped side away from crankshaft sprocket and flat side toward timing belt. Install No. 1 timing belt cover and new gasket.

    6.Align crankshaft pulley key groove with key in crankshaft. Install crankshaft pulley. Install and tighten crankshaft pulley bolt to specification.

    7.Rotate crankshaft clockwise so cylinder No. 1 is at TDC on compression stroke. Ensure timing mark on crankshaft pulley aligns with mark on No. 1 timing belt cover. If reusing timing belt, ensure reference mark on timing belt aligns with upper edge of No. 1 timing belt cover.

    8.Rotate camshaft, and align hole in camshaft sprocket with alignment mark on camshaft bearing cap. Install timing belt on camshaft sprocket. If reusing timing belt, ensure reference mark on timing belt aligns with the reference mark on camshaft sprocket. Ensure tension exists on timing belt between the crankshaft and camshaft sprockets.

    CAUTION:DO NOT rotate crankshaft counterclockwise, as viewed from timing belt end of engine.

    9.Loosen No. 1 idler pulley bolt 1/2 turn. Rotate crankshaft pulley 2 full revolutions clockwise from TDC to TDC. 10.Ensure timing mark on crankshaft pulley aligns with "0" mark on No. 1 timing belt cover, and hole in camshaft sprocket aligns with alignment mark on camshaft bearing cap. If timing marks are not aligned, remove timing belt and reinstall. 11.Rotate crankshaft clockwise 1 and 7/8 revolutions and align crankshaft pulley mark with 45-degree Before Top Dead Center (BTDC) mark on No. 1 timing belt cover.

    12.Tighten No. 1 idler pulley bolt to specification. Install No. 2 timing belt cover and gaskets. Install and tighten spark plugs to specification.

    13.To install remaining components, reverse removal procedure. Install all bolts/nuts on right (timing belt side) engine mount before tightening to specification.

    14.On Camry, when installing control rod and bracket on strut tower and right (timing belt side engine mount, tighten bolts to specification in sequence.

    Related Products