Factory best selling EN14399-5 EN14399-6 Structural Washers to Austria Importers

Factory best selling EN14399-5 EN14399-6 Structural Washers to Austria Importers

Short Description:

EN14399-5 Plain Washers EN14399-6 Chamfered Washers For High Strength Structural Steel Bolting Size: M12-M36 Finish: Black Oxide, Zinc Plated, Hot Dip Galvanized, Dacromet, and so on Packing: Bulk about 25 kgs each carton, 36 cartons each pallet Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports Please feel free to contact us for more details.


Product Detail

Product Tags

As for competitive prices, we believe that you will be searching far and wide for anything that can beat us. We can state with absolute certainty that for such quality at such prices we are the lowest around for Hex Bolt, Steel Washers Ebay, Set Screws Point Styles, Let's cooperate hand in hand to jointly make a beautiful future. We sincerely welcome you to visit our company or contact us for cooperation!
Factory best selling EN14399-5 EN14399-6 Structural Washers to Austria Importers Detail:

EN14399-5 Plain Washers EN14399-6 Chamfered Washers

For High Strength Structural Steel Bolting

Size: M12-M36

Finish: Black Oxide, Zinc Plated, Hot Dip Galvanized, Dacromet, and so on

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet

Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports

Please feel free to contact us for more details.


Product detail pictures:

Factory best selling EN14399-5 EN14399-6 Structural Washers to Austria Importers detail pictures


We always get the job done being a tangible workforce making sure that we can easily give you the very best quality as well as finest selling price for Factory best selling EN14399-5 EN14399-6 Structural Washers to Austria Importers, The product will supply to all over the world, such as: Islamabad, Philadelphia, Finland, All the employees in factory, store, and office are struggling for one common goal to provide better quality and service. Real business is to get win-win situation. We would like to provide more support for customers. Welcome all nice buyers to communicate details of our products with us!



  • 6″ Deluxe Jointer Assembly

    https://www.steelcitytoolworks.com/index.php/standard-products/40640-6-granite-deluxe-jointer-with-helical-head.html

    Assembling Mobile Base Wheels
    1. Turn the base upside down and mount the non-swiveling wheels to the base using one M8 x 50mm Hex head screw and one 8 flat washer for each wheel.
    2. Attach the leveling feet to the base by screwing the threaded portion of the foot into the threaded holes in the base.
    3. Attach the swiveling foot pedal to the base using two M8 x 20mm carriage bolts and two M8 hex nuts.
    4. turn the base back over so that the wheels are on the ground and adjust the leveling feet unit the unit does not rock or wobble.

    Mounting Jointer to Base
    1. Remove the access panel on the rear of the jointer by removing the six M6 Phillips head screws that fasten the panel.
    2. With the assistance of a helper, place the jointer on top of the base. Maker certain that the cutter head pulley on the jointer lines up with the cutout in the top of the jointer base.
    3. The jointer attaches with three M10 x 25mm lock washers and three M10 flat washer. Two are accessible through the panel in the rear of the jointer. The third is accessed through the dust chute.
    4. Tighten all three screws securely using the supplied hex wrench.

    Attaching Fence Carriage
    1. Place fence carriage assembly on top of the jointer. Align the slot in the fence carriage assembly with the slot in the jointer top.
    2. Place knob washer on the locking knob shaft and insert locking know through the two slots and faster using special nut. Make certain that the two prongs on the special nut fit into the slot on the jointer.

    Assembling Cutterhead Guard
    1. Remove the screw from the post of the cutter head guard.
    2. Attach the cutter head guard to the jointer by placing the post throughout the hole in the jointer.
    3. Turn knob on the underside of the hole 1/2 turn to put tension on the return spring. This spring allows the guard to return over the cutter head after the cut has been made.
    4. Align the slot in the post with the spring, then insert post.
    5. Check that the guard returns completely over the cutter head. If it does not, remove the guard and add another 1/2 turn to the knob. Replace guard just like you did in step 4 and recheck.
    6. Thread screw removed in step 1 into the cutter head guard post. This screw keeps the guard in place.

    Attaching Infeed Table Adjusting Handwheel
    1. Place the handwheel over the shaft on the infeed table side of the jointer.
    2. Fasten the handwheel to the shaft by tightening the set screw.

    Attaching Outfeed Table Adjustment Knob
    1. Attach knob to the shaft on the out feed side of the table
    2. Fasten knob to the shaft using one M6 Phillips head screw. Tighten securely.

    Aligning Pulleys and Assembling Belts
    1. Place a straight edge along the face of the motor pulley and the cutterhead pulley. Make certain that they are aligned. If an adjustment is necessary, you can reposition the motor pulley on the shaft of the motor by loosing the set screw on the motor pulley and moving the motor pulley until it is aligned with the cutter head pulley.
    Warning: The outside edge of the pulley must never be extended past the end of the motor shaft in any circumstance.
    2. Place the V belt onto the cutterhead pulley.
    3. Positioin the V belt over the motor pulley. It may be necessary to reposition the motor in order to get the belt onto the motor pulley. If this is the case, loosen the 4 bolts that fasten the motor to the dust chute and reposition the motor until the belt can be fitted onto the motor pulley. Retighten bolts.
    Note: If it is necessary to move the motor, be sure to recheck pulley alignment after doing so.
    4. Once the belt is positioned on both pulleys, check the belt tension by squeezing the belt at its midpoint. Proper tension is achieved when there is approximately 1″ deflection at the center span of the belt using light finger pressure.
    5. If an adjustment is necessary, raise or lower the motor until proper tension is achieved.

    Attaching Cutterhead Pulley Guard
    The cutterhead pulley guard is attached to the jointer using four M6 x 10mm Phillips fan head flange screws.

    Attaching Dust Port
    A 4″ dust port is provided for the purpose of connecting the jointer to a dust collection system. If you do not intend on connecting this unit to a dust collection system. DO NOT attach the dust port.
    The dust port is attached to the out feed side of the jointer by using four M6 x 8mm Phillips pan head screws.

    Attaching Switch Assembly
    1. Fasten the switch assembly to the rear of the jointer using two M6 x 15mm socket head cap screws and two M6 external tooth washers.
    2. Insert the cord through the hole in the jointer stand and attach to the pigtail on the jointer.
    3. Reattach the rear panel to the jointer base.

    Related Products