China Cheap price Track Shoe Bolts with Nuts to Nigeria Manufacturers
Short Description:
Professional manufacturer of Plow bolts, feature a flat or dome countersunk head design, with a square neck to prevent turning when the nut is tightened or removed. They are used in Excavator, wheel loader, bulldozer, backhoe loader blades & cutting edges. Fit for Caterpillar, Volvo, Doosan, Komatsu, Komelco, Ajax, JCB, BYG Inch Size: 3/8”-1.3/8” with various lengths Metric Size: M10-M36 with various lengths Grade: SAE J429 Grade 5, 8; 170 KSI, 180 KSI; ISO 898-1 class 8.8, 10.9, 12.9 F...
Product Detail
Product Tags
China Cheap price Track Shoe Bolts with Nuts to Nigeria Manufacturers Detail:
Professional manufacturer of Plow bolts, feature a flat or dome countersunk head design, with a square neck to prevent turning when the nut is tightened or removed. They are used in Excavator, wheel loader, bulldozer, backhoe loader blades & cutting edges.
Fit for Caterpillar, Volvo, Doosan, Komatsu, Komelco, Ajax, JCB, BYG
Inch Size: 3/8”-1.3/8” with various lengths
Metric Size: M10-M36 with various lengths
Grade: SAE J429 Grade 5, 8; 170 KSI, 180 KSI; ISO 898-1 class 8.8, 10.9, 12.9
Finish: Plain, Black Oxide, Zinc Plated, and so on
Packing: Bulk about 25 kgs each carton, 36 cartons each pallet
Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports
Please feel free to contact us for more details.
Product detail pictures:
We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of China Cheap price Track Shoe Bolts with Nuts to Nigeria Manufacturers, The product will supply to all over the world, such as: Iran, Plymouth, Egypt, We set a strict quality control system. We have return and exchange policy, and you can exchange within 7 days after receive the wigs if it is in new station and we service repairing free for our products. Please feel free to contact us for further information if you have any questions. We are glad to work for every client.
website:https://www.reliancemetalresource.com/
Tianjin Reliance Steel Pipe Industry & Trade Co., Ltd. was officially founded in 2004, and is located in Caigongzhuang Industrial Area in Jinghai County, Tianjin, China. We are a joint-stock enterprise, with 3 branch plants.
Our main products are:
Welded Pipes, Square & Rectangular Hollow Section Tubes
Galvanized Steel Welded Pipe and Pre-galvanized Steel Pipes.
Tel:(86) 189-2030-3008
Fax:(86) 022-23757190
E-mail:admin@reliancesteel.cn
Address:Hi-Tech information square, NanKai district of Tianjin.
The Ground Force leveling Kit https://www.realtruck.com/ground-force-leveling-kits/ lifts the front of your truck for a level stance. Subjected to rigorous testing to give you the best quality product.
Stay Informed and Sign Up:
https://www.realtruck.com/newsletter-signup/
Subscribe to our Channel: https://www.youtube.com/user/RealTruckCom
Follow us on Facebook: https://www.realtruck.com/facebook/?ut…
Follow us on Twitter: https://www.realtruck.com/twitter/?utm…
Follow us on Google+: https://www.realtruck.com/gplus/?utm_c…
FREE SHIPPING
Give us a call at 866-262-3738
VIdeo Transcription:
This kit will not only give you the look of a level truck, but it will also allow you to install larger wheels and tires without sacrificing the OE ride quality of the vehicle. All his can be accomplished in a few hours and for under $200 with no special tool required.
When installing this kit, please be sure to use the proper tools and safety equipment for the job. Failure to do so may result in injury to you or others. This video is intended to be used as a supplement to the installation instructions included with the kit. Always consult the printed instructions for detailed installations steps.
Start by removing the vehicle’s wheel. In this video, we’ll be working on the passenger’s side of this vehicle. Once the wheel is removed, free the AVS wire from the upper control arm, then disconnect the AVS connector located on the side of the strut assembly. Loosen the knot on the top of the sway bar end link and remove the bolt and sleeve. Loosen the knot at the bottom of the tie rod end. Using a mallet, strike the casting to free the tie rod end from inside the casting, make sure to only strike the casting itself. Remove the nut and swing the tie rod end out of the way. Place a jack under the lower control arm to support the suspension during dis-assembly. Using a pry bar to maintain pressure, remove the nut holding the upper control arm to the spindle. Gently release the tension on the pry bar to remove the upper control arm from the spindle.
From inside the engine bay, remove the three nuts holding the top of the strut tower to the frame. Leave one nut loosely threaded on one of the studs to prevent the strut assembly from falling. Remove the bolts holding the bottom of the strut to the lower control arm. Lower the jack to give the strut assembly clearance to be removed from the vehicle. While supporting the strut assembly, remove the nut on the top of the strut, and maneuver the strut assembly out of the vehicle.
For the following steps, it may be helpful to place the strut assembly in a vice. Shop towels can be used to pad the coils to prevent damage. Thread the two supplied free-running hex nuts onto one of the studs. Thread them down until they’re three quarters of an inch above the top of the strut mount. Using a wrench, lock the nuts in place. Using a cut-off tool, remove the remainder of the stud. Remove the hex nuts from the stud.