2017 Super Lowest Price ASTM A194 8M Heavy Hex Nuts for Costa Rica Manufacturer

2017 Super Lowest Price ASTM A194 8M Heavy Hex Nuts for Costa Rica Manufacturer

Short Description:

ASTM A194/A194M Grade 8M Heavy Hex Nuts Stainless Steel Nuts API 6A Flange Valve Wellhead Heavy Hex Nuts Dimension Standard: ASME B18.2.2, ASME B18.2.4.6M, ISO 4033, Din934 H=D Inch Size: 1/4”-4” with various lengths Metric Size: M6-M100 with various lengths Other Available Grade: ASTM A194/A194M 2H, 2HM, 4, 4L, 7, 7L, 7M, 8, 8M, 16 and so on. Finish: Plain, Black Oxide, Zinc Plated, Zinc Nickel Plated, Cadmium Plated, PTFE etc. Packing: Bulk about 25 kgs each carton, 36 cartons each pallet A...


Product Detail

Product Tags

We always think and practice corresponding to the change of circumstance, and grow up. We purpose at the achievement of a richer mind and body as well as the living for ISO 13918 Shear Connectors price, Welding Studs to Malaysias, A193 B16 Stud Bolts price, If you are interested in any products, please feel free to contact us for further information or please send us email directly, we will reply you within 24 hours and the best quotation will be provided.
2017 Super Lowest Price ASTM A194 8M Heavy Hex Nuts for Costa Rica Manufacturer Detail:

ASTM A194/A194M Grade 8M Heavy Hex Nuts Stainless Steel Nuts

API 6A Flange Valve Wellhead Heavy Hex Nuts

Dimension Standard: ASME B18.2.2, ASME B18.2.4.6M, ISO 4033, Din934 H=D

Inch Size: 1/4”-4” with various lengths

Metric Size: M6-M100 with various lengths

Other Available Grade:

ASTM A194/A194M 2H, 2HM, 4, 4L, 7, 7L, 7M, 8, 8M, 16 and so on.

Finish: Plain, Black Oxide, Zinc Plated, Zinc Nickel Plated, Cadmium Plated, PTFE etc.

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet

Advantage: High Quality, Competitive Price, Timely Delivery,Technical Support, Supply Test Reports

Please feel free to contact us for more details.


Product detail pictures:

2017 Super Lowest Price ASTM A194 8M Heavy Hex Nuts for Costa Rica Manufacturer detail pictures


We offer great strength in quality and development,merchandising,sales and marketing and operation for 2017 Super Lowest Price ASTM A194 8M Heavy Hex Nuts for Costa Rica Manufacturer, The product will supply to all over the world, such as: Afghanistan, Jordan, Islamabad, Each product is carefully made, it will make you satisfied. Our merchandise in the production process have got strictly monitored, because it is only to supply you the best quality, we'll feel confident. High production costs but low prices for our long-term cooperation. You can have a variety choices and the value of all types are same reliable. If you have any question, do not hesitate to ask us.



  • Subscribe and visit our weekly FIX IT Home Improvement podcast on iTunes or Stitcher https://itunes.apple.com/us/podcast/fix-it-home-improvement/id880903087?mt=2
    I always add an extra pair of stainless steel washers and huts to lock down the toilet bolts on a toilet flange. It makes installing the toilet easier and in the future it makes it easier to remove the nut holding the toilet down.



    Departmental Procedures & Guidelines for Inspections, Certifications, Load Testing, Repairs & Painting of Fire Escapes
    Inspections by Structural Engineers, Fire Escape Engineers or others acceptable to the Official:
    In layman’s terms, the city official is looking for a registered structural engineer or others qualified and acceptable by the Fire/Code Official to do a Critical Examination in lieu of a Live Load Test (criteria submitted or discussed prior to inspection) and issues written verification and certification that all connections are free of internal rust or rot as well as all original hardware (square head bolts or rivet) are reinforced and or replaced in lieu of Live Load Test. All supports (thru-bolts or cemented) into the wall must be verified and certified in lieu of Live Load Test. A fire escape confidence test and tag must be submitted if fire escape passed. The report with photos identifying violations for repairs must include repair criteria submitted to the official for repair vendor to use as a guide during and with engineer oversight of permitted repairs. A Fire Escape Confidence Test and tags identifying certified condition are then submitted. Recommended cycle for live load testing is 20 yrs after total refurbishment or as required by official.

    Repairs by Ornamental Ironworkers, Welding Companies or others acceptable to the Official:

    In layman’s terms, the city official is looking for a qualified licensed repair vendor to do all work under repair permit (if required) with engineer oversight of repair criteria submitted for approval to the official in lieu of Live Load Test. All connections must be free of internal rust or rot, spot primed and sealed. All worn material repaired and or replaced. All supports into wall reinforced, repaired and certified in a Fire Escape Confidence Test. In lieu of Live Load Test, all square head bolts, rivets and or welded connections must be certified, reinforced and or replaced based on age or condition. All ladders and cantilevers must be balanced and drop 2-3 ft per second, hit the ground and stay down and must lead to a public way. All roof ladders must be secure. No full painting of any fire escape until all spot painted repairs are inspected and certified under engineer oversight and or city official permit sign-off. Full replacement is subject to permits and or possible code upgrade requirements.
    Painting by EPA Licensed Renovators (if lead paint is present) or others acceptable to Official:
    In layman’s terms, the city official is looking for a paint vendor (EPA Certified Renovator if required) to do all work as per EPA Guidelines due to the fact that all fire escapes older than 1978 are presumed to have lead (EPA) unless identified as no lead or low lead by a licensed lead inspector. Entire building will be notified with signage and all precautions shall be taken to collect paint chips at grade. No sandblasting or power assisted scraping without full fire escape encapsulation under EPA Guidelines. All major connection shall be sealed from water intrusion before during or after painting. All escapes should be spot painted every 3-5 yrs and fully painted every 5-10 yrs or as needed or ordered by a Fire/Code Official.
    Fire Escape Codes:
    NFPA Lifesafety Code 101 7.2.8.6.2 The authority having jurisdiction shall be permitted to approve any existing fire escape Stair that has been shown by load test or other satisfactory evidence to have adequate strength.

    For more information please visit our website at https://fireescapeengineers.com or call 866-649-0333
    Fire Escape Engineers is an approved member of the Fire Escape Services Network https://www.fireescpeservices.com and a founding member of the National Fire Escape Association (NFEA) https://www.nationalfireescapeassociation.org

    Related Products