2017 Latest Design ASME B18.10 Railway Track bolt and Nut for Canada Factories
Short Description:
Professional manufacturer of Track Shoe Bolts with Nuts, feature a dome hexagon or hexagon flange head, are used on Excavator, wheel loader, bulldozer, backhoe loader blades & cutting edges. Fit for Caterpillar, Volvo, Doosan, Komatsu, Komelco, Ajax, JCB, BYG Inch Size: 3/8”-1.3/8” with various lengths Metric Size: M10-M36 with various lengths Grade: SAE J429 Grade 5, 8; 170 KSI, 180 KSI; ISO 898-1 class 8.8, 10.9, 12.9 Finish: Plain, Black Oxide, Zinc Plated, and so on Packing: Bulk ab...
Product Detail
Product Tags
2017 Latest Design ASME B18.10 Railway Track bolt and Nut for Canada Factories Detail:
Professional manufacturer of Track Shoe Bolts with Nuts, feature a dome hexagon or hexagon flange head, are used on Excavator, wheel loader, bulldozer, backhoe loader blades & cutting edges.
Fit for Caterpillar, Volvo, Doosan, Komatsu, Komelco, Ajax, JCB, BYG
Inch Size: 3/8”-1.3/8” with various lengths
Metric Size: M10-M36 with various lengths
Grade: SAE J429 Grade 5, 8; 170 KSI, 180 KSI; ISO 898-1 class 8.8, 10.9, 12.9
Finish: Plain, Black Oxide, Zinc Plated, and so on
Packing: Bulk about 25 kgs each carton, 36 cartons each pallet
Advantage: High Quality and Strict Quality Control, Competitive Price,Timely Delivery; Technical Support, Supply Test Reports
Please feel free to contact us for more details.
Product detail pictures:
Our goods are commonly recognized and reliable by consumers and may satisfy continually developing economic and social needs for 2017 Latest Design ASME B18.10 Railway Track bolt and Nut for Canada Factories, The product will supply to all over the world, such as: United States, Madagascar, Kuwait, Our R&D department always designs with new fashion ideas so we could introduce up-to-date fashion styles every month. Our strict production management systems always ensure stable and high quality products. Our trade team provides timely and efficient services. If there are any interest and inquiry about our products, please contact us in time. We would like to establish a business relationship with your honored company.
ACPV Installation: Unirac Railing Installation – Ingram’s Water & Air Equipment
See part 1 at: https://youtu.be/YxBPW2DDMWY
See part 3 at: https://youtu.be/Jp2RpbkcGAc
See part 4 at: https://youtu.be/sKMamEyI6i8
Don’t Forget to browse our selection of Ingram Solar Kits at: https://ingramswaterandair.com/heating-conditioning-solar-kits-c-45_4285.html
Thanks to modern ACPV cell technology, an Ingram’s solar energy kit is all you need to start saving money on your utility bill. Our solar energy kit includes the necessary components for operation, and, thanks to pre-mounted microinverters, these solar panels are easier to install than ever before.
These are Unirac SolarMount rails. These rails attach to your roof and support ACPV panel weight.
The very first thing you should do is determine the best roof location for the array. Most homeowners will get best results if they install the solar cells facing due south. If your home is not built to accommodate southward facing panel installation, angle the array to face due south as much as possible.
Attaching solar panel rails to an existing roof is not overly complicated. Anyone with roofing experience or good mechanical skills should be able to do it if they follow proper instruction and safety guidelines.
However, before you start attaching any physical components, you need to fully complete your array installation plan.
Complete the following steps:
●Bearing in mind the importance of facing due south, determine how much roof area you will need to dedicate to the solar array. Typical installation assumes 12 modules laid out in 3 rows of 4 modules a piece. Depending on your roof, you may have to modify this arrangement to suit your individual circumstances.
●First, measure the length and width of your ACPV modules.
●Next, calculate the required array installation area based on the length and width of the typical module, and how you plan to arrange them.
●Be sure to include in your calculations a small amount of spacing between each module. We recommend one inch, but refer to your owner’s manual for specific spacing information.
Now that you understand how the modules must be arranged, you can start preparing the roof for rail installation.
This component is called the flat flashing. Flat flashing is the physical bond between your support rails and your roof. To install the flat flashing, complete the following steps:
●Place the flashing where previously marked vertical and horizontal chalk lines intersect (this spot should be directly above a rafter). Begin with the lowest row.
●Center the flashing, and drill a hole for the lag bolt. Try to center the hole as much as possible in the rafter to create solid support.
●Before you place the flashing, we recommend you coat the underside of the flashing with a silicon “U” for additional waterproofing.
●Slide the flashing under the next highest row of tiles. At this point, about half the flashing should be concealed by roof tile, and half exposed.
●Line up the drill hole in the flashing and the roof tile.
●If you’ve done this correctly, the drill hole and the flashing should now be aligned with the previously made horizontal and vertical chalk lines. Ensure this is the case.
●Place the square aluminum piece concave side down, then the L-Foot, then the washer, and, finally, secure these components to the rafter with a lag bolt.
●Tighten as necessary.
●Complete the lowest row of flashing first, then proceed upward.
Secure the splice bar on one end with two screws. You’ll secure the other end when the rails are laid and connected to the L-footings. When you later connect two rails via a splice bar, don’t forget to connect them again with a WEEB bonding jumper
With the flashing secure to the roof, splice bars attached to our rails, and bonding jumpers ready, we can now being placing the rails themselves.
Solar rail mounts attach to the flat flashing and the rafters via L-footings. The rails may connect to either the upper or lower hole on an individual L-foot.
To attach a rail mount to an L-Foot, complete the following steps:
●Place the 3/8″ bolt into the rail footing slot.
●Slide the rail into the splice bar if there is one adjacent.
●Connect the spliced rail with a WEEB bonding jumper.
●Loosely attach the rail to the L-Foot with flange nuts.
●Ensure the rail is straight and square.
●Once you are sure the entire rail is straight and square and properly connected, you can tighten the flange nuts on the footings.
●Refer to your owner’s manual to find out how much torque your footings require for proper installation.
CÁT VẠN LỢI – Chuyên sản xuất: Ty ren /Ty treo/ Thanh ren/Ty răng cường lực cao M6, M8, M10, M12, M16, M20- mạ kẽm nhúng nóng đạt tiêu chuẩn chất lượng cao TCVN 197:2002/JIS B 1051 /DIN 975/DIN 976 (High quality Thread rod- Electro galvanized thread rod stud), Khớp nối ty ren M8- M10- M12(Thread rod coupling), Bịt đầu ty ren M8- M10- M12(Plastic end cap for thread rod), Tắc kê đạn dùng cho ty ren M8- M10- M12(Drop in Anchor), Tắc kê tường (Anchor Bolts), Tắc kê chuồn dùng cho ty ren (Heavy duty concrete Insert), Cùm treo ống/Pad treo ống/ Đai treo ống 2 mảnh / Kẹp treo ty & ống / Kẹp treo ống thép luồn dây điện, ống PCCC/ HVAC dùng cho ty ren M8- M10- M12(Steel conduit hanger/Steel conduit Clamp/Pipe hanger), Kẹp xà gồ/ Kẹp dầm thép dùng cho ty ren M8- M10- M12(Beam Clamp/Iron Beam Clamp), Kẹp treo C dùng cho ty ren M8- M10- M12(Purlin Clamp/Suspending Clamp), Kẹp treo ống HVAC dùng cho ty ren M8- M10- M12(Clevis hanger), Kẹp treo ống & ty ren dùng cho ty ren M8- M10- M12(K Clip), Kẹp treo dầm (Flange Clip), Kẹp treo Omega (Omega trap), Kẹp treo ống với kẹp C (Applicable hanger) Thanh chống đa năng (Unistrut Channel/ Strut/ C-Channel/ Double Unistrut profile ), Đai ốc lò xo cho thanh chống đa năng dùng cho ty ren M8- M10- M12(Long spring nut), Tay đỡ đơn (Cantilever Arm), U cùm (U bolts), U bolt lá, Gía đỡ cơ điện M&E /HVAC/PCCC/ Kẹp treo ống thép/ Kẹp xà gồ -Fixings and Supports for Plumbing, Fire Protection, Heating, Ventilation and Air Conditioning- Mechanical Fixings, Fasteners and Spring steel Sprinkler Supports- Pipe & hanger clip- Pipe Clamp / Máng lưới cho datacenter- Wire mesh tray/ Steel cable Basket, Thanh chống đa năng Unistrut/ C- profile systems /Strut 41 x 41 x 3000- 41 x 21 x 3000; Miệng gió nhôm /Air Grille- Louver cho hệ thống điện nhẹ M&E / HVAC/PCCC /Điều hoà không khí cho toà nhà cao tầng và nhà máy công nghiệp.
Mọi chi tiết tư vấn khách hàng về Ty ren/ Ty treo/ Thanh ren CVL(High quality Galvanized Thread rod stud), xin vui lòng liên hệ:
CÔNG TY TNHH THIẾT BỊ ĐIỆN CÔNG NGHIỆP CÁT VẠN LỢI
Văn Phòng: 504 Lê Quang Định, P.1, Quận Gò Vấp, TP Hồ Chí Minh
Điện thoại: (84.8) 3588 6496/ 3895 6808/ 2246 4699
Fax: (84.8) 3588 6505
Nhà Máy: 50 Tây Lân, P.Bình Trị Đông A, Q.Bình Tân ,TP.HCM
Website: www.catvanloi.com E-mail: sales@catvanloi.com
Phòng KD & Dự án: Ms Hiền 0902377537 / 08-22464699