100% Original Factory Hook Bolts to Hanover Importers

100% Original Factory Hook Bolts to Hanover Importers

Short Description:

A range of hook bolts, used in the roofing industry for fixing cladding and roofing panels to steel frames. Hook bolts, also commonly known as ‘J’ bolts and supplied with nuts.  Inch Thread Size: 1/4″-4″ with various lengths Metric Thread Size: M6-100 with various lengths Material Grade: Carbon Steel, Alloy Steel, and Stainless Steel covers ASTM F1554, A307, A449, A354, A193, A320, F593, ISO 898-1 4.8, 6.8, 8.8, 10.9 Finish: Plain, Black Oxide, Zinc Plated, Hot Dipped ...


Product Detail

Product Tags

Our eternal pursuits are the attitude of regard the market, regard the custom, regard the science and the theory of quality the basic, belief the very first and management the advanced for System HV Structural Bolts to Spa, A193 B7 Combination Studs to Irish, A193 B7 Bolts to Australia, We believe we will become a leader in developing and producing high quality products in both Chinese and international markets. We hope to cooperate with more friends for mutual benefits.
100% Original Factory Hook Bolts to Hanover Importers Detail:

A range of hook bolts, used in the roofing industry for fixing cladding and roofing panels to steel frames. Hook bolts, also commonly known as ‘J’ bolts and supplied with nuts. 

Inch Thread Size: 1/4″-4″ with various lengths

Metric Thread Size: M6-100 with various lengths

Material Grade: Carbon Steel, Alloy Steel, and Stainless Steel covers ASTM F1554, A307, A449, A354, A193, A320, F593, ISO 898-1 4.8, 6.8, 8.8, 10.9

Finish: Plain, Black Oxide, Zinc Plated, Hot Dipped Galvanized, and so on.

Packing: Bulk about 25 kgs each carton, 36 cartons each pallet. Or, comply with your requirement.

Advantage: High Quality and Strict Quality Control, Competitive price,Timely delivery; Technical support, Supply Test Reports

Please feel free to contact us for more details.

 


Product detail pictures:

100% Original Factory Hook Bolts to Hanover Importers detail pictures


Our growth depends to the superior products ,great talents and repeatedly strengthened technology forces for 100% Original Factory Hook Bolts to Hanover Importers, The product will supply to all over the world, such as: Ireland, Kazakhstan, Naples, Our continual availability of high grade products in combination with our excellent pre-sale and after-sales service ensures strong competitiveness in an increasingly globalized market. welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!



  • CD Weld Stud video demonstrates why stud welded fasteners are better.



    In this tutorial, we will be showing you how to properly attach the leaf, Airlift panel, and cabinet door to the Arrow SewNatra cabinets found on our site:
    SewNatra in Oak: https://www.overstock.com/Crafts-Sewing/Arrow-Sewnatra-Oak-Finish-Airlift-Crafts-Sewing-Machine-Table-with-Storage-and-Organization-Cabinet/7502095/product.html?cache=no
    SewNatra in White: https://www.overstock.com/Crafts-Sewing/Arrow-Sewnatra-White-Airlift-Crafts-Sewing-Machine-Table-with-Storage-and-Organization-Cabinet/6518575/product.html?cache=no

    https://www.overstock.com/Crafts-Sewing/Arrow-Sewnatra-Black-Airlift-Crafts-Sewing-Machine-Table-with-Storage-and-Organization-Cabinet/6518574/product.html?cache=no

    SewNatra in Black: https://www.overstock.com/Crafts-Sewing/Arrow-Sewnatra-Black-Airlift-Crafts-Sewing-Machine-Table-with-Storage-and-Organization-Cabinet/6518574/product.html?cache=no

    Before you begin assembly, please make sure you have someone to help you, as well as the following items: a screwdriver, a hammer, a box cutter, a 10mm socket, a 10mm wrench, a segment of your shipping box, and a segment of your shipping foam.

    1: Place the round magnet into the “Leaf Support L” pre-drilled magnet hole and hammer the magnet into place.
    2: Take the two leaf support hinges, four screws, and a screwdriver. Attach the hinges to the leaf support within the predrilled holes of “Leaf Support L”.
    3: Take a stick-on rubber tab and press the tab into place on the top of “Leaf Support L”. Make sure the tab is on the opposite edge from the magnet.
    4: Rotate the cabinet gently onto its back. Without touching the front piece, rotate the cabinet onto its feet (the front piece will be more secure when the cabinet top is attached).
    5: Take the bag containing 1/4-inch carriage bolts, wing nuts, and washers, and install the carriage bolts through the pre-drilled holes in “Back F” and “Back Brace G”.
    6: Take “Lift Panel K” with the Airlift attached and slide the unit onto the carriage bolts. Before proceeding, please make sure that the tops of the two panels are level.
    7: Put a washer and wing nut onto each carriage bolt and tighten them. Before you tighten them all the way, hammer the carriage bolts into the back plate to remove any gaps. Now tighten the washers all the way.
    8: Take the washer and screw from the magnet bag and install each piece in the predrilled hole on “Left Panel Side C”.
    9: Take “Leaf Support L” and the four screw remaining from the hinge bag. Attach “Leaf Support L” to the cabinet by securing the screws within hinges and predrilled holes.
    10: To install the top of the cabinet, take parts A and B with the four connecting bolts in place and secure it to the cabinet top. Make sure the flat side is facing the back and the rounded decorative edge is facing the front so that your leaf will open the correct direction. Tighten the connectors from inside the cabinet.
    11: Open the leaf support panel and open the leaf. Remove the universal panel to complete the next step.
    12: With two people, turn the cabinet on its back and then topside down while one person carefully supports the leaf.
    13: Take “Platform J”. Make sure the cream sewing surface is facing down and the curved cut-out is facing the back. Slide it under the lift into the opening.
    Optional: To make the next steps easier, insert the styrofoam cut out under the cabinet top back edge for better visibility.
    14: Install the metal wings onto the airlift using the eight 6mm hex head bolts, nuts, and washers within the same bag (there will be four bolts per wing). Place the wings on the inside of the airlift with the flange facing the outside. For now, install each bolt loosely. If you used the foam insert, please remove it before the next step.
    15: Using your box cutter and shipping box panel, cut out 8-10 cardboard squares to use as shims. Shim “Platform J” into place so that it fits evenly within the cabinet.
    16: With the remaining #8 1/2-inch pen head screws, securely attach the wings to “Platform J” with a screw into the predrilled holes.
    17: While the second person is holding “Platform J” in place, tighten the hex head bolts.
    18: With the help of a second person, turn the cabinet onto its back, and then onto its feet while supporting the leaf.
    19: To attach the cabinet door, take the three hinges and 12 screws. Attach the hinges to the door first in the predrilled holes. Attach the door to the cabinet. A second person may be needed to hold the door while attaching the hinges in place.

    Subscribe to our Overstock Channel on YouTube : https://youtube.com/user/Overstock
    Like Overstock on Facebook: https://facebook.com/overstock/
    Follow Overstock on Pinterest: https://pinterest.com/overstock/
    Follow Overstock on Twitter: https://twitter.com/Overstock
    Follow Overstock on Instagram:  https://instagram.com/overstock/

    Related Products